- Blunt Insights
- Posts
- Everton’s £800M Leap: Inside Hill Dickinson Stadium
Everton’s £800M Leap: Inside Hill Dickinson Stadium
More than football. More than steel. This is a data-rich case study in stadium economics, branding, and urban regeneration.

1. The Money: Financing Football’s Future
Construction cost: £750–800M — the single largest infrastructure project in Everton’s history.
Capacity: 52,769 seats — down 119 from the original design after post-build safety audits.
Naming Rights: Hill Dickinson, a Liverpool-based law firm, secured one of the Premier League’s most lucrative naming deals.
Valued at £6M annually (with escalators possibly pushing it near £10M).
Benchmark: Spurs’ Tottenham Hotspur Stadium still hunts for a long-term naming deal; Emirates (Arsenal) & Etihad (Man City) deals sit around £10M+ per year.
Insight: Everton monetized naming rights earlier than rivals in comparable positions — shifting a law firm (B2B) into a stadium sponsorship slot usually dominated by consumer brands (airlines, insurance, beverages). That’s bold positioning, and a signal of where commercial partnerships in football are heading.
2. Stadium as an Asset Class
This is not just a football pitch. Hill Dickinson Stadium was engineered as a multi-use commercial engine:
Hospitality & Premium Revenue: Expanded lounges, corporate boxes, event spaces — designed to triple Everton’s matchday hospitality yield.
Founding Partners Ecosystem: Pepsi Max, Budweiser, Castore, Seat Unique, Aramark, Christopher Ward.
These activations go beyond logo boards — think digital menus, branded fan zones, product placement at every touchpoint.
Noise as Branding: Opening match vs Brighton registered 126 dB — the loudest Premier League crowd ever, and 5th-loudest globally. That stat itself becomes a brand asset.
Data Lens: Everton’s projected matchday revenue uplift:
Goodison Park (2019/20 baseline, pre-COVID): ~£17M per year.
Hill Dickinson Stadium forecast: £50M+ per year, nearly tripling matchday income.
3. Regeneration: Beyond the Pitch
Everton didn’t just build a stadium — they’re driving North Liverpool’s urban turnaround:
Bramley-Moore Dock: Once derelict industrial space, now centerpiece of a £1B+ regeneration corridor.
Tourism Boost: Positioned directly on cruise ship routes — making the stadium a visitor anchor for non-matchdays.
Employment Impact: Thousands of construction jobs created; hospitality and retail footprint ensures long-term economic flow.
Legacy Management: Goodison Park isn’t abandoned — it becomes the permanent home of Everton Women, balancing heritage with growth.
Analytical Take: Stadiums in urban cores (Tottenham, Everton) deliver exponential regeneration value compared to suburban builds (West Ham, Arsenal’s move from Highbury). Expect surrounding property values and footfall commerce in North Liverpool to outperform baseline regional growth by 2–3x in the next decade.
4. The First Game: Data from Day One
Opening Premier League match: Everton 2–0 Brighton, August 24, 2025.
First Goal: Iliman Ndiaye, 23rd minute.
Second Goal: James Garner (long-range strike).
Assist Leader: Jack Grealish, instantly validating his marquee signing.
Attendance: 52,500+ — near-capacity.
Noise: 126 dB peak, “roof-lifting” moments already part of the lore.
This wasn’t just football. It was brand theatre with a decibel count.
5. Strategic Outlook
Hill Dickinson Stadium is a case study in future-proofing sports assets:
Clubs without elite matchday infrastructure risk being financially capped in the Premier League’s revenue arms race.
Everton just shifted from a £17M matchday floor to a £50M ceiling. That’s worth an extra £30M per season — equivalent to a Champions League spot without qualification.
If the club can align this infrastructure with on-pitch performance, Everton could reposition from perennial relegation battles to consistent top-half contention.
📊 The Numbers That Don’t Lie
Category | Data Point | Why It Matters |
---|---|---|
Construction Cost | £750–800M | Largest club investment in history |
Capacity | 52,769 | 10th largest in England |
Naming Rights Deal | £6–10M annually (Hill Dickinson) | Top-tier valuation for a B2B sponsor |
Noise Record | 126 dB | Premier League’s loudest ever |
Matchday Revenue Uplift | £17M → £50M+ | 3x commercial capacity |
Tourism / Regeneration | £1B+ wider economic impact projection | Stadium as anchor asset |
Legacy Strategy | Goodison Park → Everton Women | Preserves heritage, expands brand |
🔥 Blunt Take
Everton’s Hill Dickinson Stadium isn’t just a new ground — it’s a financial multiplier, regeneration engine, and data-backed branding asset. This is how you future-proof a club.
Men lie. Women lie. The numbers never do.
👉 If you’re serious about sports business, urban strategy, or the economics of fandom, this is the blueprint. Share this edition with your network. Follow Blunt Insights for the data that matters.